Possibly the most important restoration project within the Mediterranean basin, the project comprised of:
-The selective demolition of 450 constructions and the paradigmatic management of 42.000m3 of residual infrastructure, recycling practically 100% of the material;
-Extraction of exotic invasive flora, mainly Carpobrotus edulis;
-Restoration of the orography and drainage to re-establish the natural dynamics of erosion and transportation of sediments;
-The implementation of a project for public use which highlights the values of the site: in the developing and creating a hierarchy of platforms and proposing a network of viewpoints and panels indicating rocks which are suggestive of animal forms.